Start-Up Audit Form Air Cooled Condenser (6-70 Ton) – SU-FOR-02

Fillable form used when performing full start-ups of air-cooled condenser units produced after September 1st, 2022.

Section 1 Exterior Unit Preparation

Section 2 & 3 Damper Assembly and Filter Preparation

Section 4 Coil Preparation

Section 5 Supply Cabinet Preparation

Section 6 Compressor Preparation

Section 7 Condenser Preparation

Section 8 Electrical Preparation

Section 9 Heating Preparation

Section 10 Controls

Secton 11 All Cabinets Preparation

Section 12 Electrical Powered

Section 14 Controls Powered

Section 17 Damper Validation

Section 18 Heating Validation

Section 20 & 21 Safeties Validation And Wrap Up