Start-Up Documentation
Start-Up Forms
Fillable form used when performing full start-ups of water-cooled condenser units produced after September 1st, 2022.
Fillable form used when performing full start-ups of no condenser units produced after September 1st, 2022.
Fillable form used when performing full start-ups of air-cooled condenser units produced after September 1st, 2022.
Fillable form used when performing full start-ups of units produced before September 1st, 2022.
Start-Up Manuals
Step by step guide to updating RSM module software using a USB Link 2 with Prism 2 software on a Windows laptop.
Outlines wiring checks on Micro Thermo controls boards before units are powered up at start-up.
Step by step guide to setup a USB Link 2 with Prism 2 software. The guide also covers connection to the VCCX using a Windows 10 laptop and the USB Link 2 to configure the VCCX’s in i-Controller 2.0’s.
Reference manual to be used with the SU-FOR-02 Start-Up Audit Form Air Cooled Condenser (6-70 Ton), which applies to units produced after September 1st, 2022.
Outlines how to verify compressor operation using RSMD overrides on i-Controller 2.0 units in low ambient conditions.
Outlines how to wire an i-Controller sub-assembly before a start-up is performed. This guide applies to any start-up with i-Controller 1.0 that produced after September 1st, 2022.
Reference manual to be used with the SU-FOR-01 Start-Up Audit Form, which applies to units produced prior to September 1st, 2022.