R-454B i-Controller 2.0 (6-70 Ton) SPU Sequence Of Operations REV.300 – CN-IC2-23
Detailed sequence of operations for 6 to 70 ton R454B SPU’s with i-Controller 2.0 revision#300.
Detailed sequence of operations for 6 to 70 ton R454B SPU’s with i-Controller 2.0 revision#300.
Detailed sequence of operations for 6 to 70 ton ASHP R454B MPU’s with i-Controller 2.0 revision#300.
Detailed sequence of operations for 6 to 70 ton R454B MPU’s with i-Controller 2.0 revision#300.
This guide outlines how to prepare a USB thumb drive for VCCX‐IP updating and how to execute the VCCX‐IP update.
This guide includes the Copeland part numbers, wiring instructions, communication parameters and application configuration needed to setup the integration between the Flo i-Controller 2.0 and
Detailed sequence of operations for 6 to 70 ton ASHP MPU’s with i-Controller 2.0 revision#300.
Detailed sequence of operations for 6 to 70 ton WSHP MPU’s with i-Controller 2.0 revision#300.
Outlines how to use the i-Controller 2.0 REV.300 Water Balance Mode for units with water source condensers.
Outlines how to configure the BACnet communication settings for units with an i-Controller 2.0.
Overview of i-Controller Modbus status parameters that can be mapped as “Outputs” to the BMS to provide real-time status of the Flo unit.
"*" indicates required fields