Start-Up Audit Form Water Cooled Condenser (6-70 Ton) – SU-FOR-03
Fillable form used when performing full start-ups of water-cooled condenser units produced after September 1st, 2022.
Fillable form used when performing full start-ups of water-cooled condenser units produced after September 1st, 2022.
Outlines wiring checks on Micro Thermo controls boards before units are powered up at start-up.
Outlines how to wire an i-Controller sub-assembly before a start-up is performed. This guide applies to any start-up with i-Controller 1.0 that produced after September
Outlines what needs to be completed by the on-site team and signed off prior to the Flo provided start-up.